Specialized support across the OSP engineering lifecycle.
FiberGrid provides focused engineering capacity for telecom contractors, engineering firms, and network operators — from field-data preparation through final engineering deliverables.
01
Make-Ready Engineering
Engineering support for attachment and clearance analysis, make-ready recommendations, pole replacement evaluation, communication relocation requirements, and project documentation.
Attachment & clearance analysis
Make-ready recommendations
Pole replacement evaluation
Engineering documentation
02
OSP & Fiber Design
OSP design support for fiber deployments, from preliminary route development through detailed construction-ready engineering.
Route development
Preliminary engineering
Fiber infrastructure design
Construction-ready deliverables
03
Field Data & Katapult
Structured preparation and review of field data to create reliable inputs for downstream engineering and design workflows.
Pole-data review
Photo association
Annotation & tracing
Field-data validation
04
Pole Analysis & QA/QC
Engineering analysis and quality-control support focused on producing consistent, review-ready project deliverables.
Pole loading analysis
O-Calc workflows
Engineering calculations
Design verification & package review
How We Work
From field data to construction-ready design.
A structured workflow designed to integrate with established project requirements and keep engineering deliverables consistent from intake through final review.
01
Field Data
Review project inputs, pole information, imagery, and available field documentation.
02
Engineering Analysis
Evaluate attachments, clearances, existing conditions, and project requirements.
03
OSP Design
Develop the required make-ready or OSP engineering solution.
04
QA / QC
Review calculations, design decisions, documentation, and package consistency.
05
Delivery
Prepare organized engineering deliverables for client review and downstream project use.
Technical Capabilities
Built around real OSP engineering workflows.
FiberGrid combines field-data preparation, make-ready analysis, OSP design, pole analysis, and structured QA/QC to support engineering teams throughout the project lifecycle.
01
Make-Ready
Attachment analysis
Clearance review
Pole replacement evaluation
Communication relocation requirements
Make-ready recommendations
Design verification
02
OSP / Field Data
Pole-data review
Photo association
Annotation
Tracing
Route development
Field-data validation
03
Engineering
Pole loading analysis
O-Calc workflows
Engineering calculations
Design review
QA/QC
Post-inspection support
04
Project Workflows
Preliminary engineering
Application review support
Engineering documentation
Package preparation
Construction-ready deliverables
Client-specific workflow integration
Engineering Technology
Tools that support the workflow.
Katapult Pro
Field-data preparation, annotation, tracing, photo association, and engineering workflow support.
O-Calc Pro
Pole loading analysis and engineering calculation workflows supporting make-ready design.
Why FiberGrid
Engineering capacity, when your team needs it.
FiberGrid is built to support engineering teams when project demand exceeds internal capacity. Whether the need is a focused project, overflow production, or ongoing engineering support, we work within established project requirements and engineering workflows.
01
Project Support
Additional engineering resources for a defined deployment, backlog, or project requirement.
02
Overflow Capacity
Flexible engineering support when internal teams need additional production capacity.
03
Ongoing Support
Consistent engineering capacity designed to integrate with recurring production workflows.
Your workflow. Additional capacity.
FiberGrid adapts to client standards, deliverable requirements, review processes, and project-specific workflows — allowing engineering support to fit into the way your team already operates.
Project Requirements
Work aligned to defined client and project standards.
Workflow Integration
Support structured around established engineering processes.
Quality Control
Consistent review before deliverables move downstream.
Make-ready engineering, from route review to proposed solution.
A fictional 10-pole fiber attachment route illustrating how field conditions, existing infrastructure, clearance requirements, structural considerations, and route constraints can influence make-ready engineering decisions.
FICTIONAL / SANITIZED ENGINEERING EXAMPLE
Created solely to illustrate workflow and reasoning; this is not a real client project. All pole identifiers are fictional. Graphics are conceptual, not to scale, and are not final engineering drawings or construction specifications.
Proposed make-ready requirements and engineering deliverables
Original requested route / 10 polesConceptual · Not to scale
Existing infrastructure
Proposed fiber
Review location
Demonstration workflow
Application / route review→
Pre-design→
Field data→
Photo association & tracing→
Proposed attachment design→
Make-ready analysis→
Pole analysis / calculations as required→
QA / QC→
Engineering deliverables
01
P-03 / Through-bolt / riser conflict
Existing condition
The existing secondary riser is positioned within the potential path of the proposed attachment hardware. With the proposed cable continuing through the pole, the through-bolt arrangement creates a conflict with the riser location.
Engineering review
Review the proposed cable direction, through-bolt orientation, and riser position to ensure the attachment hardware does not interfere with the secondary riser.
Proposed make-ready
Reposition / rotate the secondary riser away from the through-bolt path. For this conceptual example, the riser is shifted to an approximately 45° or 315° position, subject to project requirements.
Plan view / conceptual three-bolt attachment
Existing / north-face riser
BOLT PATH / RISER CONFLICT
The north end / projection of the through-bolt meets the secondary riser on the 0° face, creating a potential contact or puncture conflict.
Proposed / rotate secondary riser
RISER CLEAR OF BOLT PATH
The secondary riser is shown at approximately 45°. The dashed outline at 315° illustrates an alternative position away from the north bolt path.
Cable direction: 90° ↔ 270° / east–west
Through-bolt direction: 0° ↔ 180° / north–south
Circular outline: secondary riser
Conceptual orientation only; not to scale. The illustrated 45° / 315° positions are specific to this demonstration, not universal requirements. Final riser positioning and attachment hardware are subject to project-specific review.
02
P-06 / Available space / pole height
Existing condition
Existing equipment is positioned low enough on the pole that adequate usable space for the proposed communication attachment is limited.
Engineering review
Evaluate equipment position, pole height, adjacent pole configuration, ground elevation, and the resulting cable profile. The engineering decision should not treat the pole in isolation.
Proposed make-ready
A taller replacement pole is illustrated as the demonstration solution. Adjacent pole heights and route grading must also be considered, subject to project requirements.
Existing pole
Low equipment position limits usable attachment space. Adjacent poles and changing ground elevation are part of the review.
Proposed replacement
A taller conceptual replacement creates room to evaluate the attachment profile together with adjacent poles and route grading.
03
P-10 / Route-end / guying constraint
Existing condition
The requested attachment route terminates at a location where the required guying arrangement cannot be feasibly installed because of the surrounding roadside / pedestrian-area constraint.
Engineering review
Review the route endpoint, tensioning requirements, surrounding conditions, and continuation options.
Proposed solution
Extend the proposed route to an appropriate pole beyond the original route limit, subject to required ownership / attachment review, allowing the route termination and supporting arrangement to be properly evaluated.
Conceptual plan / route continuation
The pedestrian / roadside area limits the original guying arrangement. A continuation pole and revised termination are options for review, subject to ownership, attachment, crossing, and project requirements—not a universal solution.
The route is the system.
Make-ready decisions are not always isolated to a single pole. Pole height, equipment position, ground elevation, span conditions, structural capacity, route limits, and adjacent infrastructure can influence the final engineering solution.
From field conditions to actionable deliverables.
The objective is to identify the work required for a proposed attachment and organize those requirements into clear engineering deliverables for client review and downstream project use.
Start a Project
Need additional OSP engineering capacity?
Whether you're working through a project backlog, preparing a new fiber deployment, or need additional Make-Ready production capacity, tell us what you're working on.
Your workflow. Additional capacity.
What happens next
01
Project Review
We review the project scope, workflow, and required engineering support.
02
Alignment
We determine how FiberGrid can support the existing process, requirements, and deliverables.
03
Next Step
If there is a fit, we define an initial scope and determine the appropriate way to begin working together.